Our client is a large shopping centre chain with a facility on Sydney’s Northern Beaches. As part of their plans for future development work they were required to re-route the sewer main which runs underneath their carpark.
The traditional solution for re-routing the sewer main included the introduction of a pump station which included prohibitive costs, significant occupational health and safety risks: and substantial interruption to services over a prolonged period
Avac’s vacuum drainage solution provided the client with a 50% cost savings while ensuring a much quicker turnaround than the traditional gravity pump station method. Occupational health and safety risks were also minimised along with a far less invasive construction program meaning shoppers were not interrupted. Avac’s remote monitoring module was installed to provide comprehensive after sales service and subsequent peace of mind for the client.
“This was a cost-driven solution which also provided a faster construction schedule and less a interruptive program.”